- Overview
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Product Description

Handlebars and handles: Special support split handles
Brakes: front 110 drum brakes, rear disc brakes
Wheel set :14-250 iron wheel, vacuum tire
Battery: Super lead acid 48V20A, endurance 75-80KM
Motor :800W60/72V motor
Front fork: Hydraulic front fork
Cushion: Foam cushion (middle seat backrest)
Instrument: Round screen digital instrument, no Chinese characters, bright square light
Controller :48V9 tube controller, three-speed, anti-theft, anti-slope, soft and hard starting
Clay tablets: Painted clay tablets, front and back, in the same color
Brake lever control key: All aluminum parking brake lever, waterproof without Chinese control button
Car Basket: Bold special car basket with lid
Packaging :CKD 100% all parts, SKD carton /1PCS DKD whole vehicle /1PCS
Surface treatment: Frame electrophoresis blackened, plastic parts painted.







Packing | carton/bag, 85%SKD,45%SKD,CKD. or customized |
Packing size(85SKD) | 160*90*33CM |
N.W | 60kg |
Loading(CKD) | 230pcs 40HQ |
Delivery time | 30 days after deposit |
Payment method | T/T, LC, West Union, Paypal, etc |
OEM | Package/LOGO/Color/Sticker, others |
Shipping | by sea, by air, by express |


Q: Are you a trading company or manufacturer?
A: We are an experienced manufacturer with a factory covering an area of 12,000
square meters.
Q: Can I have my own customized product?
A: Yes.OEM&ODM are available,including design, logo,package etc.
Q: What's the MOQ?
A: For inventory,the MOQ is 5pcs. For OEM&ODM, the MOQ is 200pcs.
Q: Can I get sample?
A: Yes. We can supply sample for quality test. You only need to pay for the sample and courier. We will arrange it in 3 working
days.
Q:What is the payment terms?
A: T/T, Western Union, Paypal ect.
Q: What's the delivery time?
A: Within 15 days for ready stock order.About 25-30 days for OEM&ODM order.The exact time depends on actual situation.